{"id":21774,"date":"2026-03-31T05:54:23","date_gmt":"2026-03-31T05:54:23","guid":{"rendered":"https:\/\/mup-energy.com\/?p=21774"},"modified":"2026-03-31T05:54:25","modified_gmt":"2026-03-31T05:54:25","slug":"geothermie-fuer-die-neue-monheimer-mitte","status":"publish","type":"post","link":"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/","title":{"rendered":"Geothermal energy for the new centre of Monheim"},"content":{"rendered":"<h3 class=\"wp-block-heading\"><strong>Sustainable energy supply for a new urban neighbourhood<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The development of modern urban neighbourhoods presents cities and project developers with a key challenge: <strong>How can a sustainable energy supply be integrated right from the planning phase?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A current example of this approach is the <strong>Redesign of the centre of Monheim<\/strong>, which is centrally located on Rathausplatz in the town of Monheim am Rhein.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the third construction phase, a new neighbourhood with residential and office buildings is being created that is consistently geared towards a long-term sustainable energy supply.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The development of a renewable energy concept for the new neighbourhood was already planned at an early stage of the project by <a href=\"https:\/\/mup-energy.com\/en\/\"><strong>M&amp;P Energy<\/strong><\/a><strong> - <\/strong><a href=\"https:\/\/siera.com\/de\/\"><strong>Member of the SIERA Alliance<\/strong><\/a> supported.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Project overview<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The centre of Monheim is being developed in several construction phases and will form an important part of the city's infrastructure in the future.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The third construction phase comprises:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>two residential buildings<\/li>\n\n\n\n<li>two office buildings<\/li>\n\n\n\n<li>a shared basement that connects several buildings with each other<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Before construction work began, several older existing buildings were demolished to create space for the new neighbourhood development.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Geothermal energy at the heart of the energy concept<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The energy concept is based on <strong>near-surface geothermal energy<\/strong>, which is used for both heating and cooling the buildings.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The system includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>170 geothermal probes<\/strong><\/li>\n\n\n\n<li><strong>95 metres depth per probe<\/strong><\/li>\n\n\n\n<li>Installation <strong>below the floor slab of the basement<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This solution utilises the ground as a long-term renewable energy source and enables an efficient and low-carbon energy supply for buildings.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Construction phase and schedule<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Preparations for the installation of the geothermal system are already underway.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Current project status:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction pit shoring completed<\/li>\n\n\n\n<li>Excavation work currently underway<\/li>\n\n\n\n<li>Start of geothermal energy construction: <strong>30 March 2026<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The installation phase of the geothermal system is expected to take around <strong>4.5 months<\/strong> last.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Geothermal energy in urban development<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Projects such as the Monheim Centre show how <strong>Geothermal energy can play a central role in the sustainable development of modern urban neighbourhoods.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">By utilising the subsurface as a renewable energy source, geothermal systems offer several advantages:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Long-term security of supply<\/li>\n\n\n\n<li>Reduction of CO\u2082 emissions<\/li>\n\n\n\n<li>High energy efficiency<\/li>\n\n\n\n<li>Reliable operation over decades<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>The role of M&amp;P Energy<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In this project, the client has been supported in the development of the geothermal energy concept since the early planning phases by <a href=\"https:\/\/mup-energy.com\/en\/\"><strong>M&amp;P Energy<\/strong><\/a><strong> - <\/strong><a href=\"https:\/\/siera.com\/de\/\"><strong>Member of the SIERA Alliance<\/strong><\/a> supported.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As part of the <a href=\"https:\/\/siera.com\/de\/\"><strong>SIERA Alliance<\/strong><\/a>, a network of environmental and engineering experts, the company contributes extensive experience in the planning and implementation of sustainable energy systems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The focus is on integrated energy solutions that combine technical feasibility, ecological responsibility and long-term operational efficiency.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Outlook<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">With the planned start of geothermal construction in spring 2026, the project represents an important step towards a sustainable energy supply for the Monheimer Mitte neighbourhood.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project shows how geothermal energy can contribute to the development of climate-friendly urban infrastructure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Further updates on the progress of the project will follow in the coming months.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Are you planning an infrastructure, industrial or urban development project and looking for a sustainable energy solution?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">From the initial feasibility study through planning and approval to the implementation of geothermal energy systems, projects are supported by the experts from <a href=\"https:\/\/mup-energy.com\/en\/\"><strong>M&amp;P Energy<\/strong><\/a><strong> - <\/strong><a href=\"https:\/\/siera.com\/de\/\"><strong>Member of the SIERA Alliance<\/strong><\/a> accompanied.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a><\/a><a href=\"https:\/\/mup-energy.com\/en\/\"><strong>Contact our specialists<\/strong><\/a> and find out how geothermal energy can be integrated into your project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Engineering for a Better Tomorrow.<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sustainable energy supply for a new urban neighbourhood The development of modern urban neighbourhoods presents cities and project developers with a key challenge: how can<\/p>","protected":false},"author":27,"featured_media":21775,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"two_page_speed":[],"footnotes":""},"categories":[62],"tags":[],"class_list":["post-21774","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-geothermie"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Erfahren Sie, wie M&amp;P Energy \u2013 Mitglied der SIERA Allianz die geothermische Energieversorgung f\u00fcr das neue Quartier Monheimer Mitte mit 170 Erdw\u00e4rmesonden unterst\u00fctzt.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"syed.aatik.ahmed@eutec.org\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_GB\" \/>\n\t\t<meta property=\"og:site_name\" content=\"M&amp;P Energy - Engineering for a Better Tomorrow\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Geothermie f\u00fcr nachhaltige Stadtquartiere | M&amp;P Energy\" \/>\n\t\t<meta property=\"og:description\" content=\"Erfahren Sie, wie M&amp;P Energy \u2013 Mitglied der SIERA Allianz die geothermische Energieversorgung f\u00fcr das neue Quartier Monheimer Mitte mit 170 Erdw\u00e4rmesonden unterst\u00fctzt.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-03-31T05:54:23+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-03-31T05:54:25+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Geothermie f\u00fcr nachhaltige Stadtquartiere | M&amp;P Energy\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Erfahren Sie, wie M&amp;P Energy \u2013 Mitglied der SIERA Allianz die geothermische Energieversorgung f\u00fcr das neue Quartier Monheimer Mitte mit 170 Erdw\u00e4rmesonden unterst\u00fctzt.\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/geothermie-fuer-die-neue-monheimer-mitte\\\/#blogposting\",\"name\":\"Geothermie f\\u00fcr nachhaltige Stadtquartiere | M&P Energy\",\"headline\":\"Geothermie f\\u00fcr die neue Monheimer Mitte\",\"author\":{\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/author\\\/syed-aatik-ahmedeutec-org\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/mup-energy.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Blog-Post-1.jpg\",\"width\":1250,\"height\":600},\"datePublished\":\"2026-03-31T05:54:23+00:00\",\"dateModified\":\"2026-03-31T05:54:25+00:00\",\"inLanguage\":\"en-GB\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/geothermie-fuer-die-neue-monheimer-mitte\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/geothermie-fuer-die-neue-monheimer-mitte\\\/#webpage\"},\"articleSection\":\"Geothermie\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/geothermie-fuer-die-neue-monheimer-mitte\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/mup-energy.com\\\/en\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/category\\\/geothermie\\\/#listItem\",\"name\":\"Geothermie\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/category\\\/geothermie\\\/#listItem\",\"position\":2,\"name\":\"Geothermie\",\"item\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/category\\\/geothermie\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/geothermie-fuer-die-neue-monheimer-mitte\\\/#listItem\",\"name\":\"Geothermie f\\u00fcr die neue Monheimer Mitte\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/geothermie-fuer-die-neue-monheimer-mitte\\\/#listItem\",\"position\":3,\"name\":\"Geothermie f\\u00fcr die neue Monheimer Mitte\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/category\\\/geothermie\\\/#listItem\",\"name\":\"Geothermie\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/#organization\",\"name\":\"M&P Energy\",\"description\":\"Engineering for a Better Tomorrow\",\"url\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/author\\\/syed-aatik-ahmedeutec-org\\\/#author\",\"url\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/author\\\/syed-aatik-ahmedeutec-org\\\/\",\"name\":\"syed.aatik.ahmed@eutec.org\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/geothermie-fuer-die-neue-monheimer-mitte\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9c9fac5516ac6c0a8feb9d3a436eb824fba9e8658e68ee554c2532c80aaa5803?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"syed.aatik.ahmed@eutec.org\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/geothermie-fuer-die-neue-monheimer-mitte\\\/#webpage\",\"url\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/geothermie-fuer-die-neue-monheimer-mitte\\\/\",\"name\":\"Geothermie f\\u00fcr nachhaltige Stadtquartiere | M&P Energy\",\"description\":\"Erfahren Sie, wie M&P Energy \\u2013 Mitglied der SIERA Allianz die geothermische Energieversorgung f\\u00fcr das neue Quartier Monheimer Mitte mit 170 Erdw\\u00e4rmesonden unterst\\u00fctzt.\",\"inLanguage\":\"en-GB\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/geothermie-fuer-die-neue-monheimer-mitte\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/author\\\/syed-aatik-ahmedeutec-org\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/author\\\/syed-aatik-ahmedeutec-org\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/mup-energy.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Blog-Post-1.jpg\",\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/geothermie-fuer-die-neue-monheimer-mitte\\\/#mainImage\",\"width\":1250,\"height\":600},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/geothermie-fuer-die-neue-monheimer-mitte\\\/#mainImage\"},\"datePublished\":\"2026-03-31T05:54:23+00:00\",\"dateModified\":\"2026-03-31T05:54:25+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/\",\"name\":\"M&P Energy\",\"description\":\"Engineering for a Better Tomorrow\",\"inLanguage\":\"en-GB\",\"publisher\":{\"@id\":\"https:\\\/\\\/mup-energy.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Geothermie f\u00fcr nachhaltige Stadtquartiere | M&P Energy","description":"Erfahren Sie, wie M&P Energy \u2013 Mitglied der SIERA Allianz die geothermische Energieversorgung f\u00fcr das neue Quartier Monheimer Mitte mit 170 Erdw\u00e4rmesonden unterst\u00fctzt.","canonical_url":"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/#blogposting","name":"Geothermie f\u00fcr nachhaltige Stadtquartiere | M&P Energy","headline":"Geothermie f\u00fcr die neue Monheimer Mitte","author":{"@id":"https:\/\/mup-energy.com\/en\/author\/syed-aatik-ahmedeutec-org\/#author"},"publisher":{"@id":"https:\/\/mup-energy.com\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/mup-energy.com\/wp-content\/uploads\/2026\/03\/Blog-Post-1.jpg","width":1250,"height":600},"datePublished":"2026-03-31T05:54:23+00:00","dateModified":"2026-03-31T05:54:25+00:00","inLanguage":"en-GB","mainEntityOfPage":{"@id":"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/#webpage"},"isPartOf":{"@id":"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/#webpage"},"articleSection":"Geothermie"},{"@type":"BreadcrumbList","@id":"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/mup-energy.com\/en#listItem","position":1,"name":"Home","item":"https:\/\/mup-energy.com\/en","nextItem":{"@type":"ListItem","@id":"https:\/\/mup-energy.com\/en\/category\/geothermie\/#listItem","name":"Geothermie"}},{"@type":"ListItem","@id":"https:\/\/mup-energy.com\/en\/category\/geothermie\/#listItem","position":2,"name":"Geothermie","item":"https:\/\/mup-energy.com\/en\/category\/geothermie\/","nextItem":{"@type":"ListItem","@id":"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/#listItem","name":"Geothermie f\u00fcr die neue Monheimer Mitte"},"previousItem":{"@type":"ListItem","@id":"https:\/\/mup-energy.com\/en#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/#listItem","position":3,"name":"Geothermie f\u00fcr die neue Monheimer Mitte","previousItem":{"@type":"ListItem","@id":"https:\/\/mup-energy.com\/en\/category\/geothermie\/#listItem","name":"Geothermie"}}]},{"@type":"Organization","@id":"https:\/\/mup-energy.com\/en\/#organization","name":"M&P Energy","description":"Engineering for a Better Tomorrow","url":"https:\/\/mup-energy.com\/en\/"},{"@type":"Person","@id":"https:\/\/mup-energy.com\/en\/author\/syed-aatik-ahmedeutec-org\/#author","url":"https:\/\/mup-energy.com\/en\/author\/syed-aatik-ahmedeutec-org\/","name":"syed.aatik.ahmed@eutec.org","image":{"@type":"ImageObject","@id":"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/9c9fac5516ac6c0a8feb9d3a436eb824fba9e8658e68ee554c2532c80aaa5803?s=96&d=mm&r=g","width":96,"height":96,"caption":"syed.aatik.ahmed@eutec.org"}},{"@type":"WebPage","@id":"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/#webpage","url":"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/","name":"Geothermie f\u00fcr nachhaltige Stadtquartiere | M&P Energy","description":"Erfahren Sie, wie M&P Energy \u2013 Mitglied der SIERA Allianz die geothermische Energieversorgung f\u00fcr das neue Quartier Monheimer Mitte mit 170 Erdw\u00e4rmesonden unterst\u00fctzt.","inLanguage":"en-GB","isPartOf":{"@id":"https:\/\/mup-energy.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/#breadcrumblist"},"author":{"@id":"https:\/\/mup-energy.com\/en\/author\/syed-aatik-ahmedeutec-org\/#author"},"creator":{"@id":"https:\/\/mup-energy.com\/en\/author\/syed-aatik-ahmedeutec-org\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/mup-energy.com\/wp-content\/uploads\/2026\/03\/Blog-Post-1.jpg","@id":"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/#mainImage","width":1250,"height":600},"primaryImageOfPage":{"@id":"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/#mainImage"},"datePublished":"2026-03-31T05:54:23+00:00","dateModified":"2026-03-31T05:54:25+00:00"},{"@type":"WebSite","@id":"https:\/\/mup-energy.com\/en\/#website","url":"https:\/\/mup-energy.com\/en\/","name":"M&P Energy","description":"Engineering for a Better Tomorrow","inLanguage":"en-GB","publisher":{"@id":"https:\/\/mup-energy.com\/en\/#organization"}}]},"og:locale":"en_GB","og:site_name":"M&amp;P Energy - Engineering for a Better Tomorrow","og:type":"article","og:title":"Geothermie f\u00fcr nachhaltige Stadtquartiere | M&amp;P Energy","og:description":"Erfahren Sie, wie M&amp;P Energy \u2013 Mitglied der SIERA Allianz die geothermische Energieversorgung f\u00fcr das neue Quartier Monheimer Mitte mit 170 Erdw\u00e4rmesonden unterst\u00fctzt.","og:url":"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/","article:published_time":"2026-03-31T05:54:23+00:00","article:modified_time":"2026-03-31T05:54:25+00:00","twitter:card":"summary_large_image","twitter:title":"Geothermie f\u00fcr nachhaltige Stadtquartiere | M&amp;P Energy","twitter:description":"Erfahren Sie, wie M&amp;P Energy \u2013 Mitglied der SIERA Allianz die geothermische Energieversorgung f\u00fcr das neue Quartier Monheimer Mitte mit 170 Erdw\u00e4rmesonden unterst\u00fctzt."},"aioseo_meta_data":{"post_id":"21774","title":"Geothermie f\u00fcr nachhaltige Stadtquartiere | M&amp;P Energy","description":"Erfahren Sie, wie M&amp;P Energy \u2013 Mitglied der SIERA Allianz die geothermische Energieversorgung f\u00fcr das neue Quartier Monheimer Mitte mit 170 Erdw\u00e4rmesonden unterst\u00fctzt.","keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-03-31 05:54:26","updated":"2026-03-31 06:59:20","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/mup-energy.com\/en\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/mup-energy.com\/en\/category\/geothermie\/\" title=\"Geothermie\">Geothermie<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tGeothermie f\u00fcr die neue Monheimer Mitte\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/mup-energy.com\/en"},{"label":"Geothermie","link":"https:\/\/mup-energy.com\/en\/category\/geothermie\/"},{"label":"Geothermie f\u00fcr die neue Monheimer Mitte","link":"https:\/\/mup-energy.com\/en\/geothermie-fuer-die-neue-monheimer-mitte\/"}],"_links":{"self":[{"href":"https:\/\/mup-energy.com\/en\/wp-json\/wp\/v2\/posts\/21774","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mup-energy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mup-energy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mup-energy.com\/en\/wp-json\/wp\/v2\/users\/27"}],"replies":[{"embeddable":true,"href":"https:\/\/mup-energy.com\/en\/wp-json\/wp\/v2\/comments?post=21774"}],"version-history":[{"count":1,"href":"https:\/\/mup-energy.com\/en\/wp-json\/wp\/v2\/posts\/21774\/revisions"}],"predecessor-version":[{"id":21776,"href":"https:\/\/mup-energy.com\/en\/wp-json\/wp\/v2\/posts\/21774\/revisions\/21776"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mup-energy.com\/en\/wp-json\/wp\/v2\/media\/21775"}],"wp:attachment":[{"href":"https:\/\/mup-energy.com\/en\/wp-json\/wp\/v2\/media?parent=21774"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mup-energy.com\/en\/wp-json\/wp\/v2\/categories?post=21774"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mup-energy.com\/en\/wp-json\/wp\/v2\/tags?post=21774"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}