Projects

Filter M&P ENERGY Business Units
Filters M&P GROUP Business Units
Picture1_586x439-300x300
Deconstruction concept, tendering, supervision of pollutant clean-up, gutting, blasting, construction of excavation pit with special foundation engineering
Construction
a-2-300x300-1
Ed. Züblin AG
Energy concepts, Geothermal energy
CO2 footprints for 2 locations in Jena (D) and Jeřmanice (CZE)
Environment
CO2 footprint and ESG report for the group including approx. 10 independent GmbHs in Germany
Environment
a-1-300x300-1
CO2 footprints for 3 locations in Germany
Environment
Calculation of CO2 footprint Scope 1 / 2 / 3 , selection of suitable offset projects
Environment
engineer-meeting-architectural-project-working-with-partner
CG Group & GASAG Solution Plus
Energy concepts, Geothermal energy
safety-goggles-drafts-near-laptop
STOFANEL Investment AG
Energy concepts, Geothermal energy
Project management B-plan procedure "Semiramis industrial estate
Environment
Project development commercial park - Zum Schleusenpark, Datteln
Environment
Construction of a multifunctional sealing system at the Ihlenberg landfill site
Environment
Environmental due diligence ("quick check") for a land development near Hamburg
Environment
Approval procedure for the capacity expansion of a zinc smelter
Environment
Picture34-300x300-1 (2)
Central Station-Magdeburg "Ernst-Reuter-Allee
Water
Groundwater flow model Potsdam-Mitte
Water
Picture32-300x300-1 (2)
Jänschwalde large-scale hydrogeological model
Water
Wind farm Krummensee 3 - Hydrological report for early CEF measure
Water
Surface sealing Duisburg Hochfeld
Geotechnics
Kanonenberg landfill
Geotechnics
Superstructure Schleyerhofweg landfill site
Geotechnics
Self-monitoring of Castrop-Rauxel landfill
Geotechnics
Closure of the former Colonia landfill and new development
Geotechnics
Extension, new construction and conversion measures, Wunstorf airfield
Soil
Expansion of the Kiel Canal, test field exploration for explosive ordnance
Soil
Grasbrook district development
Soil
Versmannkai East, site clearance BF 102-110
Soil
Conversion of former BW hospital Rostrup, Bad Zwischenahn
Soil
Picture21-300x300
Supplementary Detailed Investigation of the Contaminated Site Risk of the Hastedter Osterdeich Property in Bremen
Soil
Picture13-4-300x300
Orientation investigation (Phase IIa) of the Bad Arolsen site shooting range, Bad Arolsen
Soil
Picture13-3-300x300
Historical exploration of the former Kurhessen barracks, Hann. Münden
Soil
Picture13-2-300x300
Orientation investigation of old deposits in Tündern
Soil
Picture13-1-300x300
Orientation investigations of the "Wustrow Z3" drilling mud pit
Soil
Picture3-1-300x300
BV Deconstruction Muskator Works Düsseldorf
Construction
Picture1-300x300
BV Deconstruction Märkisches Zentrum Berlin
Construction
error: Content is protected !!!